Tuesday, September 13, 2016

PKH Trang - Install Solar Ceiling Fans

During the end of August 2016, we started to install solar power for ceiling fans at PKH Trang. During the hot seasons, the classrooms gets very hot with the bright sun shining and all the sun energy is wasted. We installed a 1KW photo-voltaic system to power the ceiling fans for all the classrooms. The system only uses 2 batteries with minimum energy storage for night time use. It is meant for only day-time use.
The team started bringing the solar items from Kg Speu and the installation begins.






Beside this system, there is an existing photo-voltaic system which provides security lighting and basic lighting for the kitchen and toilets for night time use.



The installation is completed and the training centre now enjoy cool breeze in the classrooms because the ceiling fans are powered by the sun.

Thursday, June 30, 2016

Visit Cambodia PKH Trang

In July 2016, I visited Cambodia PKH Trang to see the solar installation at the training centre.

The school children are provide with free breakfast and lunch at school. This is encourage them to attend school.

 A basic dental care is taught to the children by a volunteer dentist.
They have dug a pond to store the rain water during the raining season. This is to provide additional water storage during the dry season.
We visited one of the school children house near the vicinity. In their compound, they have a kiln to make charcoal from the firewood.
Inside the kiln. The firewood are kept inside the kiln with fire for 15 days to become charcoal.
We stay at PKH Aoral, below is a picture of the delicious dinner prepared by the cook. Excellent!

 Time to return home, farewell group picture.

 We visited a waterfall in the Aoral.
 

Tuesday, June 14, 2016

Audio Bible Users (Updated)

Audio Bibles for the Isaan tribe in Thailand.





Solar Lamp Post (Lithium Ion Batteries)

We have a new design for the solar lamp post using Lithium Ion batteries.



Trial testing at home in Singapore.