We tested the charge controller, deep cycle batteries and inverter together with the solar panels as a system and wired them to power a CFL Lamp. The system work fine and will wait for the building to be completed before the locals can wire up the 9 CFL lamps along the corridors of the training centre.
The system block diagram and calculations are shown below.
To be continued.
No comments:
Post a Comment